chiller plant

IMEC has been chosen by Dow Chemical to design and build a chiller plant to augment current capacity in its Marlborough, MA facility. Two new 700 Ton chillers will be integrated to create 1,400 Tons of additional capacity.

The chillers will be complemented by a single two-cell cooling tower and two prefabricated duplex pump skids with Variable Speed Drive (VSD) technology. An ultrasonic flow meter will monitor flow and chilled water load to the facility, with an Allen Bradley PLC maximizing the efficiency of the system.

IMEC’s creative design has produced a utility rebate of $500,000.

The project is underway with a scheduled completion date of Spring 2019

Complimentary Energy Efficiency Evaluation

SPECIAL OFFER

Learn about how our scientific approach to sustainable mechanical engineering will take your facility into a future of ultra efficiency.

energy efficiency evaluation

Our engineers will dramatically improve your plant efficiency and help you take advantage of utility company rebates to cover a portion of the cost.

Through a combination of generous utility company rebates and IMEC’s high-efficiency engineering solutions, you’ll realize the benefits of streamlined mechanical systems that produce huge annual power savings.

We recently completed a project that is saving a customer over $1,100,000, annually.

Even if you don’t think you need a new mechanical system, it’s likely that we will discover a facet of your facility’s efficiency that can be improved dramatically. As an Authorized National Grid Project Expeditor, we also manage the utility rebate process for you.

Submit this form to receive your Complimentary Energy Consultation and Systems Evaluation:

  • Plant walkthrough
  • Identification of energy-saving projects
  • Estimated ROI / Payback time
  • Projected utility company rebates

An IMEC sales engineer will contact you to arrange a Complimentary Energy Consultation and Systems Evaluation.

Pin It on Pinterest