IMEC Articles

Just Completed: Heat Recovery Skid Installation for Cedars Mediterranean Foods

The first Heat Exchanger captures the low grade heat from the MD Air Dryers and the second Heat Exchanger captures the high grade heat from the Air compressor circuit. An additional heat exchanger was added to preheat water for the CIP process. Based on a cost of $1.00/therm, the total cost savings is more than $30,000 per year.

National Grid Recognizes IMEC with Project Expeditor Award for Customer Satisfaction

During National Grid’s Project Expeditor Kickoff Meeting, IMEC was presented with the 2018 Project Expeditor Award for Customer Satisfaction.

McCormick & Company Recognized for Top Energy Project of 2018, Designed and Built by IMEC.

McCormick & Company, a Fortune 1000 manufacturer of food and flavorings, has been recognized by Energy Star for a Top Energy Project of 2018. The honor was awarded for a “compressed air system with heat recovery” in the company’s Dallas manufacturing plant.

Dow Chemical Hires IMEC to Design and Construct New Chiller Plant

IMEC has been chosen by Dow Chemical to design and build a chiller plant to augment current capacity in its Marlborough, MA facility. Two new 700 Ton chillers will be integrated to create 1,400 Tons of additional capacity.

Just Completed: Heat Recovery Skid Installation for Cedars Mediterranean Foods

Just Completed: Heat Recovery Skid Installation for Cedars Mediterranean Foods

The first Heat Exchanger captures the low grade heat from the MD Air Dryers and the second Heat Exchanger captures the high grade heat from the Air compressor circuit. An additional heat exchanger was added to preheat water for the CIP process. Based on a cost of $1.00/therm, the total cost savings is more than $30,000 per year.

No Results Found

The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.

Pin It on Pinterest